A road sign in AutoCAD: 72 minutes or 2? A case study with time and cost

November 2026

We took a real road sign to the Romanian standard SR 1848-3 and counted everything you do in AutoCAD from scratch: letters, spacing, borders, shields. Then the same sign in JointLib, with a time and cost estimate for a 30-sign project.

Read article →
Rigid Circular Footing on Clay: FE Settlement and Bearing Capacity

October 2026

A 3 m rigid circular footing on undrained clay, axisymmetric finite elements: bearing capacity 6.097·c_u against 6.05·c_u exact (+0.78 %), stiffness −0.09 %.

Read article →
Slope Stability by Strength Reduction FEM: a Worked Example

October 2026

Factor of safety of the Griffiths & Lane (1999) 2:1 slope by finite-element strength reduction: 1.356 against 1.4 published, and 1.277 with a partially submerged toe.

Read article →
Horseshoe tunnel with finite elements — support pressure, volume loss and lining forces

October 2026

A 6 × 5.5 m horseshoe tunnel 12 m below the surface, crossing from a clay layer into a sand layer, excavated under a support pressure and then lined, analysed in the browser. Volume loss comes out at 0.17 % after excavation and 0.19 % at the end, surface settlement at 4.0 mm, and the 35 cm lining carries 540 kN/m of compression at the crown and its largest bending moment at the corners of the flat invert.

Read article →
Braced excavation step by step — a staged finite element model and its results

October 2026

A 4 m excavation with a concrete wall and a strut, modelled stage by stage with finite elements in the browser: how the model is built, why the K0 initial state matters, what displacements and forces come out (27.2 mm, 20.3 kNm/m, 25.4 kN/m).

Read article →
The Berlin anchored excavation — Mohr-Coulomb versus Hardening Soil on a published benchmark

October 2026

The triple-anchored wall of the Berlin excavation (Schweiger 2002), 13 stages with dewatering and prestressed anchors, analysed with finite elements in the browser using three material models. The wall moves 36.9 mm with Mohr-Coulomb and 29.0 mm with Hardening Soil, but the ground behind it heaves by 55.5 mm in one case and settles by 16.0 mm in the other.

Read article →
Axisymmetric pile with a contact — load–settlement curve, N(z) and the role of the R factor

October 2026

A 0.6 m × 5 m concrete pile in sand, modelled axisymmetrically with finite elements and a contact band along the shaft. At 113 kN on the head the head settles by 1.53 mm, and 82 % of the load goes into the ground through shaft friction. How to read the load–settlement curve, how the axial force N(z) is obtained and how much the contact factor R matters.

Read article →
391 automated checks for the geotechnical FEM solver — the complete census

September 2026

We publish all 391 automated checks of the geotechnical FEM solver — 74 against external sources (published benchmarks, papers, a real laboratory test), 101 closed forms of our own, 216 invariances and guards — with the full table and the stories behind it.

Read article →
Boussinesq Stress Bulb — A Complete Worked Example

September 2026

How vertical stress spreads through soil under a foundation, the Boussinesq formula for a rectangular footing, a full worked example, and a free online stress bulb calculator.

Read article →
Eurocode 7 Sheet Pile Design: A Free Online Calculator

September 2026

How the embedment depth of a cantilever sheet pile wall is found by moment equilibrium, a complete worked example, and a free Eurocode 7 sheet pile design calculator.

Read article →
Active Earth Pressure Calculator: Rankine Method Explained Step by Step

August 2026

How to calculate active earth pressure on a retaining wall with the Rankine method, a complete worked example, and a free active earth pressure calculator.

Read article →