What this page does

The borehole manager keeps all the data of a ground investigation in one place: the investigation points (boreholes, trial pits, probes), the stratification, the samples, the SPT and dynamic probing tests, the groundwater levels and the laboratory results. From these data it produces the borehole logs, the site map, the geotechnical profile along a section line and, finally, the calculation model in the geotechnical model.

Describing one borehole is easy. The hard part is keeping 50 or 300 of them correct and up to date: the same data get copied from the field sheet into a spreadsheet and then into a drawing, the laboratory results arrive weeks later and have to be matched to the right sample, and every new borehole means redrawing the profile. Here the data are entered once, and everything after that is generated from them.

How the project is organised

The tree on the left follows the order of the field work:

  • Project: name, client, stage, coordinate system and level datum.
  • Investigation: the investigation points, each with:
    • Location details: code, type, status (planned / in progress / complete), final depth, ground level, Stereo 70 coordinates, chainage and offset from the axis, dates, drilling method;
    • Geology: depth from / to, soil symbol per EN ISO 14688-1, description, geotechnical unit;
    • Samples & tests: bag, tube or block samples, SPT tests (N = N₂ + N₃), dynamic probing DPL/DPM/DPH/DPSH;
    • Water: struck and stabilised levels;
    • Laboratory: one row per sample, with grading, Atterberg limits, physical indices, compressibility, swelling and shear strength.
  • Project views: the holes table, the site map, the section, the geotechnical units and the summary.

Depths are always given in metres below ground. The level appears once, at the point, either absolute or relative.

The borehole log

The right-hand panel shows the log of the selected hole, redrawn after every change, at 1:200, 1:100 or 1:50. There are two forms:

  • the log (A4): hatched lithology, levels, description, unit, samples, groundwater and the SPT plot;
  • the summary log (A3 landscape), the form used in Romanian geotechnical reports: the stratification with the laboratory results on the sample's row. It covers grading in six fractions, wL, wP, IP, IC on the consistency scale, w, γ, n, e, Sr, swelling, compressibility (M₂₋₃, ep₂, im₃, cᵥ), φ', c', cᵤ and SPT N.

The PDF button prints the selected log, or every log of the project at once.

The checks

The bottom panel lists what is missing or does not match:

  • errors: gaps or overlaps between layers, layers that stop short of the final depth, unknown symbols, samples or tests below the end of the hole, repeated point codes;
  • warnings: missing dates, layers without a geotechnical unit, laboratory results without a sample at that depth.

Clicking a check opens the table where the fix belongs.

From boreholes to the calculation model

In the field many layers are described, with different descriptions. A calculation model needs a few geotechnical units with parameters. The "Unit" column of each layer does this grouping, and the top-down order of the units becomes the sequence in the model. Where a unit is missing in a hole, it goes in with zero thickness, so that the model can interpolate between holes.

In the Section view you pick two boreholes and a band width. The holes inside the band are projected onto the line and the geotechnical profile is drawn, with the units interpolated between holes and the groundwater line. "Send to the geotechnical model" opens the calculation model with:

  • the soils created from the units (γ, c', φ', E);
  • the boreholes placed at their distance along the line, with the layers generated from them;
  • the groundwater level, stabilised where available, otherwise struck;
  • supports on the boundary and a flat base (the last unit is extended down to the bottom of the deepest hole).

Units and characteristic values

For each unit, the Geotechnical units view gathers the laboratory results of the samples that fall inside its layers and computes the characteristic values. By default it follows the Romanian normative NP 122:2010, required by NP 112-2014 §I.4.3(4):

  • mean, relation (3.4): \(X_k = X_m(1 - k_n V_x)\), with \(k_n\) from Table 3.2 (95 % confidence: 1.69 for 3 samples, 1.18 for 4, 0.58 for 10, 0.31 from 30 upwards). With few samples, "V_x known" can be ticked, using the coefficients of variation of Annex A.4 (\(\tan\varphi'\) 0.10; \(c'\), \(c_u\) 0.40; moduli 0.30) and the matching column of the table;
  • \(\varphi'\) and \(c'\) together (§3.2.2(2), Annex A.5): when the shear test points ("σ:τ" in kPa) are entered on the laboratory sheet, all points of the layer give the regression line \(\tau = \sigma\tan\varphi + c\). The characteristic line is the parallel shifted down by \(t_\alpha s_c\): \(c_k = c - t_\alpha s_c\), with \(t_\alpha\) from Table A.5.1. The correlation coefficient \(r\) is shown too;
  • local value, relation (3.5): \(X_{k,loc} = X_m(1 - 2V_x)\), for local failure under structures that cannot redistribute loads (Annex A.2).

The EN 1997-1 §2.4.5.2 methods, with the statistics of EN 1990 Annex D, remain available as alternatives: the mean at 95 % confidence and the 5 % fractile (\(k_n\) from Table D1).

In every method the friction angle is processed through \(\tan\varphi'\). Cohesion does not go below zero, and for \(\gamma\) the mean is used. Below 3 samples no statistical value is given. The panel also checks Table 3.1 of NP 122: if the variation of \(\gamma\), \(w\), \(I_C\), \(e\) or \(I_P\) exceeds the admitted maximum, the layer is too heterogeneous for one geological element and should be split.

For each parameter the table shows the number of values, the mean, the range, the coefficient of variation, \(k_n\) or \(t_\alpha\) and the full calculation. "Use γ, c', φ'" writes them into the unit, with the method noted as the source. Statistics do not replace the engineer's judgement.

Coordinates and map

Coordinates are entered in Stereo 70 (X = north, Y = east), the Romanian national grid. For the map and for "Use current position" (the GPS of a phone or tablet) they are converted to WGS84 with the official EPSG transformation for Romania, to an accuracy of about 3 m. That is enough for a map and for recording where a hole was drilled, but not for setting out: survey coordinates are entered directly.

Import and export

  • Excel: the template has one sheet per list (points, layers, samples, SPT, probing, water, laboratory, units). Columns are matched by name, not by position. "Empty template" downloads a file ready to fill in.
  • JSON: the whole project, as a file to save and reopen.
  • DXF: the borehole logs, the section and the site plan. The plan places each hole at its Stereo 70 coordinates (CAD X = east, CAD Y = north, 1 unit = 1 m), so it overlays the survey plan directly. It has CAD layers by hole type, a label with the code, ground level and depth, the coordinate table and, when the Section panel is open, the section line.
  • The current project is saved automatically in the browser, so it is still there when you come back. For safety and for team work, save it as a file.