The Berlin anchored excavation — Mohr-Coulomb versus Hardening Soil on a published benchmark
Published 19 October 2026 · 🇷🇴 Română
In short: The triple-anchored wall of the Berlin excavation (Schweiger 2002), 13 stages with dewatering and prestressed anchors, analysed with finite elements in the browser using three material models. The wall moves 36.9 mm with Mohr-Coulomb and 29.0 mm with Hardening Soil, but the ground behind it heaves by 55.5 mm in one case and settles by 16.0 mm in the other.
The problem
The Berlin excavation is one of the most cited numerical exercises in geotechnics. Schweiger (2002) collected the solutions of several teams for the same real excavation: 16.8 m deep in sand, a 0.8 m diaphragm wall, three rows of prestressed ground anchors and dewatering inside the pit. The answers came out very different from each other, although they all started from the same data. The main reason was not the software used but the constitutive model.
That makes the example useful to a designer: on a well-known problem it shows what changes when you move from Mohr-Coulomb, with a single Young's modulus, to a model whose stiffness depends on stress level and on the loading path (Hardening Soil). The example opens ready-made in the JointLib geotechnical model, with Mohr-Coulomb. For the other two variants you only change the soil model.
The model
| Item | Data |
|---|---|
| Pit | 60 m wide (half is modelled, 30 m, plus 70 m of retained ground), model 100 m deep |
| Excavation | four lifts: −4.80 / −9.30 / −14.35 / −16.80 m |
| Wall | concrete, 0.8 m thick, toe at −32 m, E = 30 GPa |
| Anchors | three rows at −4.80 / −9.30 / −14.35 m, inclined at 27°, 8 m grout body; prestress 768 / 945 / 980 kN at spacings of 2.30 / 1.35 / 1.35 m |
| Water | initial level at −3 m; dewatering only inside the pit, between the surface and −30 m, in five steps down to −17.9 m |
| Sand 1 (down to −20 m) | φ′ = 35°, ψ = 5°, c′ = 1 kPa, γ = 19 / 20 kN/m³ above / below water |
| Sand 2 (below −20 m) | φ′ = 38°, ψ = 6°, c′ = 1 kPa, γ = 19 / 20 kN/m³ |
| Mohr-Coulomb | E = E₅₀ = 45 / 75 MPa, ν = 0.2 |
| Hardening Soil | E₅₀ = E_oed = 45 / 75 MPa, E_ur = 180 / 300 MPa, m = 0.55, ν_ur = 0.2, R_f = 0.9, p_ref = 100 kPa |
| HS-small | as Hardening Soil, plus G₀ = 2.25 · G_ur and γ₀.₇ = 0.0002 |
The parameters are the ones published for the benchmark. Nothing was recalibrated to make the result look better: the three variants differ only in the constitutive model.
The stages
- Initial state (K0), with water at −3 m. The wall enters in the next stage, together with the dewatering ("wished-in-place"), so it does not take the fictitious settlement the solver uses to generate the initial stresses.
- Dewatering in five steps: the water inside the pit drops to −6, −9, −12, −15 and −17.9 m. Behind the wall the level stays where it was, as if the bottom of the pit were sealed by an impermeable barrier at −30 m.
- Excavation and anchors, alternating: lift 1, anchor 1 prestressed, lift 2, anchor 2, lift 3, anchor 3, lift 4 down to −16.8 m.
13 stages in total. Displacements are measured from the end of the K0 stage: the settlement under self-weight, which the solver uses to generate the initial stresses, is not a real movement of the ground.
Results
Mechanical check of the anchors. In the prestressing stage, the force in each anchor has to be exactly the prestress divided by the anchor spacing:
| Row | Computed | Expected | Deviation |
|---|---|---|---|
| 1 | 333.6 kN/m | 768 / 2.30 = 333.9 kN/m | −0.09 % |
| 2 | 699.1 kN/m | 945 / 1.35 = 700.0 kN/m | −0.13 % |
| 3 | 725.4 kN/m | 980 / 1.35 = 725.9 kN/m | −0.07 % |
Dewatering settles the ground behind the wall by 12.7 mm (Hardening Soil). The published reproductions of the benchmark give, for the same stage, "about 1 cm" and "about 3 cm"; the analysis falls between them.
At the final depth of 16.8 m:
| Model | Maximum wall displacement | δ/H | Ground over the first 30 m behind the wall (mean) |
|---|---|---|---|
| Mohr-Coulomb | 36.9 mm | 0.219 % | +55.5 mm (heave) |
| Hardening Soil | 29.0 mm | 0.172 % | −16.0 mm (settlement), maximum −20.8 mm |
| HS-small | 26.5 mm | 0.157 % | −19.0 mm (settlement), maximum −23.7 mm |
How to read the numbers:
- The wall. Completed excavations in sands and stiff clays show measured wall movements of 0.07 to 0.40 % of the excavation depth, with a mean of 0.20 %. Hardening Soil (0.172 %) and HS-small (0.157 %) are inside the band, below the mean. Schweiger also gives a threshold: below 30 mm at 16.8 m, an analysis is far off reality. Here both advanced models come out below it, at the limit (29.0 and 26.5 mm). The known part of this: the wall is tied to the ground without interfaces, so with the full friction of the sand and no slip, which makes it stiffer than a real diaphragm wall; the benchmark specification has a wall friction angle of 20°. The variant with interfaces is in progress.
- The ground behind the wall is the result that made the benchmark famous. Mohr-Coulomb lifts the ground by 55.5 mm on average, while measurements on real sites show settlement. Hardening Soil and HS-small settle it by 16.0 and 19.0 mm. The difference is not one of magnitude but of sign.
- The wall alone does not separate the models. Between 36.9 and 29.0 mm the difference is 27 %. A designer looking only at wall displacement would conclude that the constitutive model matters little. The large difference is in the ground, which is exactly where the neighbouring buildings are.
Why the ground heaves with Mohr-Coulomb
Excavation unloads the ground: below the formation level the vertical stress drops by the weight of the removed soil, and behind the wall the horizontal stress drops. Real soil is 3–4 times stiffer in unloading than in first loading (here E_ur = 4 · E₅₀). Mohr-Coulomb has a single modulus, usually the loading one, so the bottom of the pit swells too much and lifts the whole soil block, including the wall and the ground behind it. Hardening Soil uses the unloading modulus where the ground unloads and a modulus that grows with stress, so the base heaves less and the ground behind the wall settles, as observed on site.
For design: if the question is "how much will the building next to the excavation settle", a Mohr-Coulomb analysis can give the wrong sign. For forces in the wall and the anchors the difference is smaller, but not negligible. And the parameters of an advanced model come from tests (triaxial, oedometer), not from generic correlations.
How to reproduce it
Open the geotechnical model with the Berlin excavation loaded and press Run: the Mohr-Coulomb variant takes a few minutes. For the comparison, open the dialog of each sand, switch the model to Hardening Soil and fill in the moduli from the table above. You need a free account; the first 3 runs of every Studio program are free, no card needed.
The figures above come from the automated benchmark of this example, run at every full regression of the solver. All 391 checks are described in the article on the checks (in Romanian) and on the solver page.