Axisymmetric pile with a contact — load–settlement curve, N(z) and the role of the R factor
Published 19 October 2026 · 🇷🇴 Română
In short: A 0.6 m × 5 m concrete pile in sand, modelled axisymmetrically with finite elements and a contact band along the shaft. At 113 kN on the head the head settles by 1.53 mm, and 82 % of the load goes into the ground through shaft friction. How to read the load–settlement curve, how the axial force N(z) is obtained and how much the contact factor R matters.
The problem
A short bored pile under axial load. The designer wants to know three things: how much the head settles under the working load, how much of the load reaches the toe, and how much is shed by shaft friction, that is, the shape of N(z), the axial force with depth.
The code methods (EN 1997-1, with shaft and base resistances from correlations or load tests) give the capacity, not the settlement. A finite element analysis gives both, on one condition: between the pile and the soil there has to be a contact that can slip. Otherwise the soil is "glued" to the concrete and shaft friction has no ceiling.
An isolated pile under centric load is symmetric about its axis, so it is modelled axisymmetrically: a vertical section through half the pile, which the analysis revolves around the axis. Results are for the whole pile, in kN, not per metre.
The model
| Item | Data |
|---|---|
| Domain | radius 5 m, depth 10 m, axisymmetric |
| Pile | elastic concrete, radius 0.3 m (Ø 0.6 m), length 5 m, E = 30 GPa, ν = 0.2, γ = 24 kN/m³ |
| Sand | E = 20 MPa, ν = 0.3, c′ = 1 kPa, φ′ = 30°, γ = 18 kN/m³, Mohr-Coulomb |
| Contact | 3 cm band along the shaft, R = 0.67 |
| Load | 400 kPa on the pile head, i.e. P = 400 · π · 0.3² = 113.1 kN |
| Mesh | 0.5 m elements |
| Boundaries | base fixed, axis and outer edge fixed horizontally |
What R means. The contact band is a thin layer of soil with reduced strength: the friction angle becomes tan δ = R · tan φ′ (here δ = 22.8° instead of 30°), the cohesion R · c′, and the shear stiffness drops with R². R = 1 means a contact as strong as the soil; R = 0.67 is a usual value for concrete cast against sand. The design value depends on the construction method and has to be justified, not picked.
The stages
- Initial state (K0). The pile is already there, "wished in place" (no installation effects). In this stage the contact is elastic: soil slipping along the pile is not a real phenomenon before loading.
- Equilibrium — one step with no new loads and the contact active. Displacements start from zero, without the self-weight settlement of the K0 stage.
- Loading the head, in 10 steps.
Results
Load–settlement curve (head settlement from the start of loading):
| P [kN] | 11.3 | 22.6 | 33.9 | 45.2 | 56.5 | 67.9 | 79.2 | 90.5 | 101.8 | 113.1 |
|---|---|---|---|---|---|---|---|---|---|---|
| s [mm] | 0.13 | 0.26 | 0.38 | 0.52 | 0.65 | 0.79 | 0.94 | 1.10 | 1.28 | 1.53 |
Up to about half the load the curve is practically straight: the stiffness is about 88 kN/mm. Towards 113 kN it softens: over the last 2.8 kN the stiffness is 37 kN/mm, 2.4 times lower. That is the start of slip along the shaft, from the top down.
Axial force N(z) (due to the load, i.e. the difference from the equilibrium stage):
| Depth | ΔN |
|---|---|
| 0.1 m (below the head) | 112.3 kN |
| 2.4 m (mid-shaft) | 86.8 kN |
| 4.9 m (near the toe) | 20.1 kN |
So of 113 kN, about 93 kN (82 %) goes into the ground through shaft friction and only 20 kN (18 %) reaches the toe. That is the usual behaviour of a short bored pile at working loads: the shaft mobilises at displacements of a few millimetres, the base needs much larger ones.
The role of R — the same model with R changed:
| Contact | Head settlement | ΔN at the toe |
|---|---|---|
| no contact (soil bonded to concrete) | 1.23 mm | not available (without a contact band there is no column for N(z)) |
| R = 1.0 | 1.26 mm | 15.2 kN (13 %) |
| R = 0.67 (the example) | 1.53 mm | 20.1 kN (18 %) |
With a weaker contact the shaft carries less, the base more, and the head settles 21 % more than with R = 1. Without a contact the curve stays straight to the end (0.12 mm per 11.3 kN): shaft friction has no ceiling, so the final softening does not appear. At higher loads the difference grows, because the shaft reaches its friction ceiling sooner.
How it was checked
N(z) is not read directly from the analysis: it is the integral of the vertical stress over the pile section, ∫ σ_z · 2πr dr, on horizontal cuts. Its checks are independent of the integral itself:
| Check | Result | Reference | Deviation |
|---|---|---|---|
| N below the head grows by the applied force | 112.33 kN | P = 113.10 kN | −0.68 % |
| Shaft equilibrium: N(top) + W − N(bottom) = friction | 95.86 kN | 95.24 kN, read separately from the band shear | +0.65 % |
| Point load on the head, away from it | profile of the distributed load | Saint-Venant | ≤ 0.58 kN of 100 |
| Shaft capacity, extrapolated to a zero-thickness band | 57.838 kN | 2π · a · L · σ_r · tan δ = 57.869 kN | −0.05 % |
How to reproduce it
Open the geotechnical model with the pile loaded and press Run; the analysis takes under two minutes. N(z) appears in the results, on the column of the contact. For the curve, add a curve point on the pile head. For a different R, change the factor in the contact dialog. You need a free account; the first 3 runs of every Studio program are free, no card needed.
All 391 checks of the solver are described in the article on the checks (in Romanian) and on the solver page.